Ship blocks fitting works

– Positioning ship blocks in dock;

– Centering  ship blocks;

– Drawing ship blocks;

– Cutting technological additions;

– Chamfering and preparation for welding;

– Ship blocks welding;

– Reducing possible tension in the structure of the ship ,through hot straightening with oxyacetylene flame;

– Polishing the coupling area  and delivering to CTC and beneficiary.